Project TitleMechanical, Civil & Electrical Works At Decentralized Water Injection System
ClientLukoil
Contract DurationOne Year
LocationWest Qurna 2/Cluster6
LocationWest Qurna 2/Cluster8
LocationWest Qurna 2/Cluster10

Project Overview and Summary

The project involves complete mechanical, civil, and electrical installations for a Decentralized Water Injection System to support enhanced oil recovery in Cluster 8 of the West Qurna 2 field. The works are critical to boosting reservoir pressure and improving production efficiency.

Scope of Work:

  • Construction of concrete foundations and access roads

  • Supply and installation of injection pumps, piping, valves

  • Electrical systems including transformers, cabling, and MCC panels

  • Integration of water filtration and chemical dosing units

  • Instrumentation and control wiring for SCADA interface

🔷 Resource Utilization

👷 Manpower (Estimated Peak)

PositionQuantity
Project Engineers6
Civil Crew (Formwork/Rebar)20
Mechanical Fitters/Welders18
Electricians & Cable Teams12
QC/HSE Staff5
Operators & Drivers10
Laborers30
Total~101

🚧 Machinery & Equipment

EquipmentQuantity
Excavators (20-ton)3
Concrete Mixers2
Welding Machines10
Cranes (50-ton)2
Diesel Generators3
Forklifts2
Vibratory Compactors2

🔷 Technical Details

System ComponentSpecification
Injection PumpsHorizontal split case, 800 m³/h
Pipe MaterialAPI 5L GR B / A106 Gr. B (carbon steel)
Pipe Diameter16” to 24” (varied sections)
Electrical CablingXLPE armored 3-core, 11kV & LV
Transformers1500 kVA oil-immersed type
InstrumentationPressure transmitters, flow meters, PLCs
SCADARemote RTUs, modbus interface
Civil FoundationsRCC pad with anchor bolts (M40 concrete)

🔷 HSE Overview

IndicatorValue
Total Man-Hours Worked~90,000
LTIs0
First Aid Cases5
Fire/Spill Incidents0
Safety Trainings Conducted18 sessions

Key HSE Measures:

  • Daily permit-to-work enforcement

  • Electrical isolation and lockout/tagout for testing

  • Heat protection and hydration stations on-site

  • Waste segregation and spill containment pits

🔷 GIS / Location-Based Details

  • Coordinates (Cluster 8): Approx. 30.67°N, 47.48°E

  • Soil Type: Sandy-clayey mix with moderate bearing

  • Nearby Features:

    • WQ2 central processing facility – 5 km west

    • Irrigation canals – 2.5 km north (protected)

  • GIS used for trench alignment, underground cable routing, and safe zone mapping

🔷 Stakeholder Engagement

StakeholderEngagement Role
LUKOIL Engineering Dept.Design approval, QA audits
Basrah Oil Company (BOC)Field permissions and inspections
Local Authorities (Al-Mudaina)Civil permits and traffic control
Cluster 8 Operations TeamIntegration, tie-ins
MTCO-IQ Safety & HRCommunity liaison, local hiring

Community Outreach:

  • Monthly briefings to local municipality

  • Hiring of ~20% unskilled labor from local villages