Contract TitleGas Pipeline Connection Project
ClientsBasrah Gas Company (BGC)
DurationOne Year
LocationWest Qurna 1

Project Overview and Summary.

To construct and commission a high-pressure natural gas pipeline connecting the West Qurna 1 field with BGC’s central processing facilities. The project aims to increase gas capture from associated petroleum gas (APG) and reduce flaring.

Scope of Work:

  • Route survey and right-of-way clearance

  • Supply and installation of 18-inch high-pressure carbon steel pipeline (28 km length)

  • Construction of valve stations and pig launcher/receiver

  • Hot tapping and tie-in to existing infrastructure

  • NDT, hydrostatic testing, and commissioning

  • HSE management throughout the project lifecycle

Key HSE Activities

  • Daily toolbox talks and weekly safety meetings

  • H2S monitoring and gas detection training

  • Dust and noise suppression around ROW and welding areas

  • Firefighting drills (monthly)

  • Heat stress mitigation plan: shaded rest zones, electrolyte water, shift rotation

  • Regular calibration of gas detectors and safety gear

  • Wildlife protection policy (e.g., relocating snakes/lizards safely)

Engagement Activities

  • 3 stakeholder consultation meetings before mobilization

  • Land access agreements signed with tribal leaders (compensation packages included)

  • Monthly community update sessions (Arabic presentations + Q&A)

  • Local labor hiring quota: 30% from surrounding villages

  • Grievance redress mechanism with hotline and village drop-boxes

  • Marshland protection workshops in coordination with local NGO